CAISSONS AND PILES DRILLING

Caisson drilling and shoring in los Angeles and suburbs is a construction technique used to create deep foundations for large structures, such as bridges, piers, and buildings, particularly in challenging environments like water or soft soils. The process involves the installation of large, hollow, cylindrical structures called caissons, which are typically made of steel or reinforced concrete. These caissons are drilled or sunk into the ground to reach stable bedrock or a solid layer that can support the weight of the structure. Once in place, the caisson is filled with concrete to form a strong, stable foundation. Caisson drilling is often used when traditional shallow foundations are not feasible due to the depth required or poor soil conditions. This method ensures structural stability in areas where load-bearing soil is inaccessible, making it a crucial technique for heavy construction projects.

caisson-piles
caisson-drilling

Key features of caisson drilling:

  • Our professional technicians will initiate a visit to your site to examine the existing topography and determined the access and restrictions. The process then begins with the drilling of a hole to the required depth. Our professional operators achieved that by using various drilling techniques such as rotary drilling or augering. Depending on the engineering plans various drilling diameters can be indicaticed such as 24", 30", 36", 42", 48" or 60" width. Our drilling rigs also varies in sizes from Babydrill with 3' access requirement to Midi Drill and large drill rigs.
  • Once the desired depth is reached and approved by a soil deputy technician, a caisson or casting is typically placed into the hole. This structure can be filled with concrete to create a solid foundation.

Challenges:

  • The initial cost can be higher than other foundation methods.
  • The drilling Process can be complex and may require specialized equipment and expertise. Hiring Zone Bolt, Inc will assure the clients reliability, expertise and problem solving in most complex situations.

In summary caisson drilling stands as a testamentto engineering ingenuity allowing for the sturdy foundations of structures that withstand the test if time, even admist the most challenging environments. Our professional estimators are ready to take on your inquiry and provide you with a very competing price that won't hurt your pocket.

caisson-foundation

Drilling in high water tables:

Drilling in areas with a high water table requires specific techniques to manage the water and ensure safety and efficiency. Here are some steps Zone Bolt Inc wants you to consider:

  • Depending on the purpose, methods like rotary drilling, air drilling, or casing methods might be appropriate. For deep foundations, caisson drilling or auger drilling with casing may be used.
  • Our drilling crew sometimes drill a casing into the ground to create a barrier that prevents water from flooding the hole. This is especially important in loose or saturated soils.
  • Another method is to Implement a Pumping System: If water enters the drilling site, using pumps to remove excess water can help maintain a dry working area. This is crucial for stability and safety.
  • or finally we can utilize Bentonite Slurry: In some cases, bentonite can be used to create a slurry that helps stabilize the walls of the hole and prevent water from entering.

Here are a few real-world examples of piles drilling projects from California and the benefits these customers experienced:

Customer: A commercial real estate developer in San Francisco Project: A 20-story office building near the waterfront. Challenge: The project site was located in an area with soft, unstable soils due to its proximity to the bay, making traditional shallow foundations unsuitable. The building needed to be earthquake-resistant, which is a top priority in the Bay Area. Piles Drilling Solution: The contractor used bored piles and reinforced concrete piles drilled deep into the bedrock beneath the soft soil layers. This created a strong, stable foundation capable of supporting the weight of the high-rise and resisting seismic forces. Benefits:

  • Seismic Stability: The piles provided the necessary strength to withstand potential earthquakes, a key consideration in California.
  • Long-Term Durability: The deep foundation ensures the building will be stable for decades.
  • Reduced Risk of Settlement: Piles drilling helped avoid settling issues in the soft soil, ensuring the structure remains level over time.

Customer: A homeowner in Malibu, California Project: A luxury beachfront home built on the cliffs of Malibu. Challenge: The homeowner wanted to build a large, multi-story house on a steep, sloped coastal cliff, where soil erosion and shifting were concerns. Traditional foundations were not feasible due to the sandy, unstable ground near the ocean. Piles Drilling Solution: The contractor used helical piles to anchor the structure into the more solid rock layers beneath the sandy soil. These piles were screwed deep into the earth, stabilizing the foundation in the shifting terrain. Benefits:

  • Coastal Erosion Resistance: Piles drilling helped the home remain stable despite the constant risk of soil erosion from the nearby ocean.
  • Minimal Impact on Surrounding Landscape: The installation of helical piles required less excavation than traditional foundation methods, preserving the natural beauty of the coastline.
  • Improved Structural Integrity: The helical piles provided an incredibly solid foundation that would resist the forces of wind and shifting soil common in coastal areas.

Customer: A property development company in Los Angeles Project: A mixed-use commercial and residential complex in downtown LA. Challenge: The construction site was located in a densely developed urban area with nearby high-rise buildings, underground utilities, and high traffic. The soil was also highly compressible and unsuitable for a conventional slab-on-grade foundation. Piles Drilling Solution: The contractor used continuous flight auger (CFA) piles to drill deep into the ground, bypassing the weaker, compressible layers to reach more stable soil. The piles were reinforced with steel to support the heavy weight of the multi-story structure. Benefits:

  • Stability in Urban Settings: Piles drilling allowed the foundation to be placed deep enough to avoid issues with compressible soil while minimizing disruption to nearby structures and utilities.
  • Efficient Installation: CFA piles are quicker to install than traditional deep foundations, reducing construction time and costs.
  • Enhanced Load-Bearing Capacity: The deep foundation ensured that the complex could support the weight of both commercial and residential spaces, including the heavy traffic and high foot traffic typical in urban centers.

Customer: California Department of Transportation (Caltrans) Project: A new bridge as part of a major highway expansion project in San Diego. Challenge: The site had challenging soil conditions, including layers of soft, compressible soils overlying dense rock, making it unsuitable for traditional foundations. The bridge needed to withstand high traffic loads and seismic forces. Piles Drilling Solution: The contractor used drilled shafts, or caissons, to reach deep, stable rock layers. These deep foundations were reinforced with concrete and steel to support the heavy weight of the bridge and withstand seismic forces. Benefits:

  • Seismic Resistance: The piles provided a solid foundation that ensured the bridge would withstand earthquakes, a critical factor in California.
  • Improved Safety: The stable foundation minimized the risk of settlement or failure, ensuring long-term safety for travelers.
  • Cost-Effective Long-Term Solution: By using piles drilling, Caltrans avoided costly issues with settling or instability in the future, ensuring the infrastructure project’s success for decades.

Customer: A healthcare provider in Sacramento, California Project: Expansion of a medical facility, adding several floors to an existing hospital building. Challenge: The hospital site had existing structures, utilities, and high water table levels, complicating the installation of a foundation that could support additional floors. The surrounding area also had clay-heavy soils, which were not suitable for conventional foundations. Piles Drilling Solution: The contractor used concrete piles that were driven deep into the ground to bypass the unstable layers of clay and reach solid bedrock. The piles were placed in a grid pattern beneath the expanded building to distribute the load evenly. Benefits:

  • Quick and Non-Disruptive Installation: Piles drilling allowed the expansion to proceed without disturbing existing hospital operations or utility lines, minimizing downtime and disruptions.
  • Stable Foundation for Growth: The deep foundation ensures that the hospital can expand further without worrying about the building settling or shifting, providing safety for patients and staff.
  • Support for Heavy Loads: The piles provided adequate support for the weight of the new floors, which would include critical medical equipment and services.
Right space Right left-line Right right-line